Solar Installation Plan

SOLAR INSTALLATION PLAN

Solar installation plan is one of the UMP initiatives in reducing overall energy consumption in line with the Pelan Kampus Lestari and Long-Term Green Campus Blueprint. The duration of this initiative is 15 September 2020 to 30 June 2021.

Benefits of Solar Installation to UMP:

  • Installed by NEM (Net Energy Metering), where TNB will buy the energy generated at RM 0.36 per kw/h (1: 1).
  • Proposed installation on the ground and roof of the walkway at on campus.
  • 5,000 students will enjoy this renewable energy, as university savings, income generation and even a place to students and staff study and study solar technology.
  • Improve the ranking of the Green Matrix UI.
  • Reduction of carbon dioxide emissions to the environment.
  • Long -term income generation

Summary of the project:

Solar Installation Capacity: 4.2 MWp

Location: parking area, walkway, roof

Installation Cost: RM2.5mil/MW

Duration: 10 months

Project Implementation: Usahasama Swasta dan Agensi UMP; Dekad Aliran Sdn. Bhd; Yayasan UMP