In 2012, a project to test sustainable energy was conducted in Malaysia under the purview of MOSTI and SIRIM Berhad. UMP Pekan Campus, due to its strategic location, was selected as one of the test-site for four wind turbines with the power of 2 kW, 4 kW, 5.8 kW and 10 kW.

The campus which is situated near coastal area provides the windy condition which enables the turbine to convert the kinetic energy into electrical power efficiently. The wind turbines in UMP Pekan Campus are shown in the following photographs:


DSC 7597